Sanyo PJ-Net Organizer Plus POA-LN02 Manual de usuario Pagina 18

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 116
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 17
18
Chapter 2 Installation
Mounting
The AC cord must be disconnected from AC power outlet when mounting or removing this prod-
uct. It may damage the product.
Do not connect the AC cord until after connecting the LAN cable and computer.
[2] Installation and network configuration
Caution
!
1 Disconnect the AC plug from the monitor.
2 Remove the screws on the back of the cabinet, and then remove the terminal covers.
3 Inser t the network unit into
the monitor, and fix it with the
screws.
Vista de pagina 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 115 116

Comentarios a estos manuales

Sin comentarios